Investigative Monitoring Event on November 08, 2023
for Six Mile Creek under Base Flow conditions
Notes: Event Time = Time of sampling (Eastern Time) at stream mouth (Plain St.); Midline Rd. (Midline)- "sampling location flooded by beaver dam"
Six Mile Creek Monitoring Event Graph
This bar graph reports the raw data for each location that was sampled as part of the monitoring event conducted on this date. To view results for individual water quality indicators, click-off other indicators in the legend at the bottom of the graph.
Event Results
Scroll down to view the event results for each monitoring location.
| Location | Analyte | Value | Units | Remarks | Location |
|---|---|---|---|---|---|
|
Buffalo () |
Turbidity | 0.95 | NTU | Lab | |
| Total Phosphorus (as P) | 8.61 | ug/L | Lab | ||
| Temperature | 5.5 | C | Field | ||
| Specific Conductance | 220.0 | uS/cm | Lab | ||
| Soluble Reactive Phosphorus (as P) | 5.8 | ug/L | Exceeded 15 min. holding time for filtration | Lab | |
| Solids, Total Suspended | 0.63 | mg/L | non-detect | Lab | |
| Nitrate-+Nitrite-Nitrogen (as N) | 0.02 | mg/L | Lab | ||
| Kjeldahl Nitrogen, Total (as N) | 0.1 | mg/L | non-detect | Lab | |
| E. Coli | 20.0 | Colonies/100 ml | Lab | ||
| Chloride | 19.8 | mg/L | Lab | ||
|
Yellow Barn Road (Yellow Barn) |
Turbidity | 1.2 | NTU | Lab | |
| Total Phosphorus (as P) | 9.31 | ug/L | Lab | ||
| Temperature | 4.0 | C | Field | ||
| Specific Conductance | 159.0 | uS/cm | Lab | ||
| Soluble Reactive Phosphorus (as P) | 5.48 | ug/L | Exceeded 15 min. holding time for filtration | Lab | |
| Solids, Total Suspended | 0.63 | mg/L | non-detect | Lab | |
| Nitrate-+Nitrite-Nitrogen (as N) | 0.005 | mg/L | non-detect | Lab | |
| E. Coli | 10.0 | Colonies/100 ml | non-detect | Lab | |
| Chloride | 26.0 | mg/L | Lab |